Valves, pumps, generator sets and hydraulic systems — bonded-assembled, load-tested and certified before export under RCEP. Every unit ships with verifiable test data.
Yangpu Electromech operates in the Yangpu Bonded Port of the Hainan Free Trade Port — bonded assembly, aging test and RCEP export of industrial valves, pumps, generator sets and hydraulic systems.
Our assemblies work across water supply and treatment, power generation, oil & gas, and general industry — managing the flow of liquids and gases under tough operating conditions.
Pump skids, valves and level instrumentation for municipal and industrial water — monitored for cavitation, bearing temperature and dry-run, sized for 50Hz and 60Hz grids.
Learn more →Diesel generator sets for standby and prime power, engine-generator coupling and load-bank aging test, tropical-climate adapted.
Learn more →Valve assemblies + positioners + hydraulic power units for EPC and refinery isolation, tracking pressure, temperature and actuator torque.
Learn more →Utility valves, compressed-air distribution and hydraulic systems for industrial parks and process plants.
Learn more →Import core components → bonded assembly in Hainan → performance & aging test → export under RCEP.
Valve assembly, skid-mounted groups, actuator integration.
To the product →Pump-motor assembly, hydraulic performance test, aging run.
To the product →Engine-generator coupling, control integration, load-bank test.
To the product →Power-unit assembly, valve-group integration, pressure & flow test.
To the product →Industrial Agent attaches to the hardware we sell — and to equipment you already run. It reads vibration, temperature and pressure in time-series, warns 7–30 days before failure.
Industrial Agent attaches to the hardware we sell — and to equipment you already run. It reads vibration, temperature and pressure in time-series, warns 7–30 days before failure.
Four solutions that turn our Yangpu manufacturing base into a complete export capability.
Value-add processing in Yangpu bonded zone, reducing duty and cost under RCEP.
Load and performance aging tests with batch test curves — verifiable, not just stated.
7–30 day early warning, turning maintenance from reactive into planned.
Third-party spare-parts warehouses across ASEAN and the Middle East.